Skip to content
    Hong KongBest Price6-12 Month WarrantyFree ShippingService & SupportHong KongBest Price6-12 Month WarrantyFree ShippingService & Support
    MinerHaolanHong Kong
    Country guide

    Indonesia Crypto Mining | Hashrate, Power & Rules

    Indonesia is geothermal and coal capacity, with island-by-island grid variation. This page covers what power actually costs, what the rules are, and which hardware suits the local climate and grid.

    $0.060 - $0.090/kWh

    Published power range

    Indonesia

    Market

    Legal (mining unregulated)

    Mining status

    2.1%

    Global bitcoin hashrate (est.)

    Power, climate and rules at a glance

    Electricity$0.060 - $0.090/kWh
    Energy mixcoal and geothermal, with hydro
    Cooling constrainttropical - hot and extremely humid year round
    Legal statusCrypto is regulated as a tradable commodity under OJK oversight (transferred from Bappebti in January 2025). Owning and operating mining hardware isn't prohibited, but unlike trading it has no dedicated licensing framework yet - it sits in a legal grey area, with academic and industry calls for Indonesia to write dedicated mining rules. Grid capacity varies substantially between islands, so siting decisions are dominated by whether an industrial connection exists at all.
    Relevant algorithmsSHA256, Scrypt

    Sources: spark.money Bitcoin Mining Profitability by Country; oneminers 2026 electricity survey. Indicative published ranges, not a quote for your tariff. Hashrate share: Hashrate Index - Top 10 Bitcoin Mining Countries of 2026 (Bitcoin mining hashrate share, estimated, 2026.). This is informational, not legal or financial advice.

    Hardware suited to Indonesia

    Mining locations in Indonesia

    All mining markets

    Indonesia mining FAQ

    What decides where mining is viable in Indonesia?+

    Whether an industrial power connection exists at your chosen site. Generation is coal- and geothermal-heavy and concentrated on different islands than demand, and transmission is the bottleneck. A cheap tariff in a region with no spare connection capacity is not usable.

    Buying hardware for Indonesia?

    We ship from Kwai Chung, Hong Kong and can advise on the right cooling specification for your climate and power rate.